TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 154 of 540

TM 9-2330-326-14&P
6-78
b. Installation.
Secure anti-sail bracket (4) and mud flap (3) to semitrailer using four new locknuts (1), washers (2),
and screws (5).
c.
Follow-On Tasks.
1.
Connect semitrailer to prime mover.
2.
Remove tire chocks and ground boards.
3.
Raise landing legs.


Back to Top