TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 163 of 540

TM 9-2330-326-14&P
6-87
6-31. REFLECTORS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Anti-seize compound (Item 40, Appendix F)
Equipment Conditions:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
Ground boards emplaced
General Procedure:
a. Removal.
NOTE
There are four amber reflectors and four red reflectors and
they are all removed and installed the same way. This
procedure covers one reflector.
Remove self-tapping screw (2) and amber reflector (1) or red reflector (3) from semitrailer.
Discard self-tapping screw.


Back to Top