TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 169 of 540

TM 9-2330-326-14&P
6-93
6-34. HUBODOMETER REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
C. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
References:
Tool kit, general mechanic’s (Item 4, Appendix B-3)
Appendix H-36
Equipment Conditions:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
Ground boards emplaced
CAUTION
Do not stand on hubodometer.
NOTE
§
For detailed procedures and/or instructions see referenced
Paragraph H-36.
§
When ordering a new hubodometer specify the mileage from
the old hubodometer. Stemco will preset the mileage on the
new hubodometer.
General Procedure:
a. Removal.
Remove nut/lockwasher (2) and hubodometer (1) from vehicular bracket (3). Discard nut/lockwasher.


Back to Top