TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 70 of 540

TM 9-2330-326-14&P
4-10
Table 4-1. Unit PMCS (Cont.)
ITEM
NO.
INTERVAL
M
S
A
T
MI
ITEM TO
CHECK/
SERVICE
PROCEDURE
EQUIPMENT NOT
READY/
AVAILABLE IF:
13
M
S
A
T
MI
Every
?
6,000
Studs and
Flange nuts
a. Check studs and flange nuts for
damage.
NOTE
All flange nuts and studs have
right-hand threads,
b.
Flange nut torque:
Torque flange nuts to 50 lb-ft (67.8 N•m) and
then tighten to 450–500 lb-ft (610–678 N•m)
using DRY torque.
c. Torquing sequence is as follows:
Using DRY torque for flange nuts and
studs, facing wheel, clockwise
sequence starting at top (see
Appendix H-57).
Studs or flange nuts
are damaged or
loose.
CAUTION
Do not use air or electric tools
to adjust
ASAs.
Initial
adjusting
procedures
start
with
measurements
not
tear-down.
14
M
S
A
T
MI
Every
?
6,000
Automatic
Slack
Adjusters
(ASAs)
Check for any binding, broken, worn or loose
parts, missing hardware, evidence of an out-of-
adjustment condition, worn clutch, and release
action.
Binding, wear,
loose parts,
missing hardware,
out-of-adjustment
conditions are
evident.
15
M
S
A
T
MI
Every
?
12,000
Axles
Check axles for proper alignment (refer to
Appendix H-38 and TB 9-2510-242-40, Nov 95,
page 21-25). If suspension is damaged, notify
Direct Support maintenance.
Axles are not in
alignment.


Back to Top