TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 60 of 540

TM 9-2330-326-14&P
3-12
Table 3-1. Operator/Crew PMCS (Cont.)
ITEM
NO.
INTERVAL
ITEM TO
CHECK/SERVICE
PROCEDURE
EQUIPMENT NOT
READY/AVAILABLE IF:
25
After
Air Reservoir Tanks
Pull
reservoir
drain
cables
to
remove
all
condensation.
System is not drained of
moisture.
26
After
Bolster Plate Drain
Hole
Check to make sure bolster plate drain holes
are not plugged with grease.
Bolster plate drain holes are
plugged.
27
After
Semitrailer
Cleanliness
After
operation,
especially
in
mud,
salt
environment, or fording conditions, flush out
axles, axle ends, suspension, landing gear,
underside/topside of semitrailer and stowage
box with clean, low-pressure water:
a. Clean
and
lubricate
all
parts
as
specified in the Appendix C to make
sure
water/debris
is
flushed
out
of
system.
b. Check
all
electrical
connections
for
corrosion and security.
c. Make sure all painted surfaces are
touched up where necessary to prevent
rust.
Not
accomplished
when
mission permits or mission
completed.
28
Weekly
Wheels
NOTE
Mission
requirements,
urgency,
safety, and common sense should
be considered in determining NMC
status of semitrailer.
Check all wheels for handhold cracks, cracks
between and around stud holes, rust streaks
and grease stains. Notify Unit maintenance.
(See Appendix H-24.)
Cracks or leakage is evident.
29
Monthly
Frame and Decking
Perform a visual inspection of semitrailer for
evidence of corrosion and condition of upper
and lower deck wood. Visually check all welds
for rust and cracks. Notify Unit maintenance if
corrosion or deck damage is evident.


Back to Top