TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 69 of 540

TM 9-2330-326-14&P
4-9
Table 4-1. Unit PMCS (Cont.)
ITEM
NO.
INTERVAL
M
S
A
T
MI
ITEM TO
CHECK/SERVICE
PROCEDURE
EQUIPMENT NOT
READY/
AVAILABLE IF:
11
M
S
A
T
MI
Every
?
6,000
Reflectors
If screws are removed/replaced apply a light
coat of antiseize compound to all threads.
WARNING
No
disassembly
of
air
brake
chamber is authorized. Before
any work is performed on the
spring brake system, chock the
wheel front and rear to prevent
semitrailer
movement.
When
inspecting or caging air brake
chambers,
do
not
position
yourself in front of, or in line
with,
the
chamber.
Serious
injury or death may occur if this
warning is not followed.
Discarded air brake chambers
must
be
safely
and
properly
disposed
of.
They
should
be
disarmed prior to disposal to
prevent
present
and
future
injury. (See Appendix H-20.)
12
M
S
A
T
MI
Every
?
6,000
Air Brake
Chamber
Clean and visually inspect clamp bands,
castings
(case),
and
fasteners
for
looseness, damage, and missing hardware
or leaking air.
Hardware is loose
or missing or
castings are
damaged or
leaking air.


Back to Top