TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 361 of 1116

TM 9-2330-330-14&P
0071 00-1
AIR BRAKE CHAMBERS MAINTENANCE
0071 00
THIS WP COVERS:
Removal, Installation, Test, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic’s (item 4, WP 0171 00)
Materials/Parts References
Compound, thread sealing (item 7, WP 0174 00)
WP 0069 00
Lockwashers (8) (item 13, WP 0175 00)
WP 0076 00
Equipment Conditions
Semitrailer disconnected from prime mover (refer to
WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
Air reservoir drained (refer to WP 0007 00)
Fail-safe brake chambers caged (refer to
WP 0078 00)
WARNING
No disassembly of air brake chamber is authorized. Before any
work is performed on the spring brake system, chock the wheel
front and rear to prevent semitrailer movement.
When
inspecting or caging air brake chambers, do not position
yourself in front of, or in line with, the chamber.
Serious injury
or death may occur if this warning is not followed.
Discarded air brake chambers must be
safely and properly
disposed of.
They should be disarmed prior to disposal to
prevent present and future injury.
NOTE
There are four air brake chambers and they are replaced
the same way. This procedure replaces one air
brake chamber.


Back to Top