TM 9-2330-334-13&P
STACKING TRAILER/PREPARATION FOR TRANSPORT - Continued
0056 00
Change 1
0056 00-22
UNSTACKING-Continued
13.
Rotate transport brackets (7) 180 degrees.
14.
Position transport brackets (7) under rear splash guards on both top and bottom trailer.
15.
Install three nuts (5) and bolts (6) in all four sets of transport brackets (7).
16.
Tighten nuts (5) to 126-148 lb ft (171-201 N·m) on all transport brackets (7).