TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 531 of 1348

MAIN HARNESS REPLACEMENT - Continued
13
1
2
3
4
5
6
7
8
9
10
11
12
Figure 16.
Main Harness Installation.
27.
Install two electrical connectors (Figure 16, Item 12) and chains (Figure 16, Item 11) on trailer electrical bracket
(Figure 16, Item 9) with eight screws (Figure 16, Item 10) and locknuts (Figure 16, Item 13).
WARNING
Adhesives, solvents, and sealing compounds can burn easily, can give off harmful vapors,
and are harmful to skin and clothing. Keep away from open fire and use in well-ventilated
area. If adhesive, solvent, or sealing compound gets on skin or clothing, wash immediately
with soap and water. Failure to comply may result in injury or death to personnel.
NOTE
Perform Steps (28) through (30) only if replacing diode assembly (Figure 16, Item 3).
28.
Apply Nyogel 760G inside main harness diode assembly connector (Figure 16, Item 4).
29.
Install diode assembly (Figure 16, Item 3) in main harness diode assembly connector (Figure 16, Item 4).
30.
Secure diode assembly (Figure 16, Item 3) to parking brake line (Figure 16, Item 2) with two cable ties (Figure
16, Item 1). Secure diode assembly in vertical position.
END OF TASK
TM 9-2330-342-23&P
0059
0059-13


Back to Top