TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 710 of 1348

INSTALLATION - Continued
3
4
5
6
7
8
9
3
11
10
2
1
Figure 8.
Trailer Air Harness Installation.
2.
Install air harness connector 2605 (Figure 8, Item 8) on front lower multifunction valve fitting (Figure 8, Item
9).
3.
Apply sealing compound to threads of multifunction valve fitting (Figure 8, Item 5).
4.
Install air harness connector 2142 (Figure 8, Item 4) on right rear lower multifunction valve fitting (Figure 8,
Item 5).
5.
Apply sealing compound to threads of multifunction valve fitting (Figure 8, Item 7).
6.
Install air harness connector 2143 (Figure 8, Item 6) on left rear lower multifunction valve fitting (Figure 8, Item
7).
TM 9-2330-342-23&P
0079
0079-10


Back to Top