TM 9-2350-238-20- 2
2-93. MAINTENANCE OF EQUIPMENT STOWAGE INSTALLATION, TACKLE STOWAG E
TRAY, AND BOOM TRAY STOWAGE HANDLE (CONT) .
INSTALLATION (CONT )
4
5
6
7
8
9
1 0
Install headless straight pin (9) in hook
handle (10) .
Install hook handle (10) in handle (11) an d
secure with headless straight pin (12) .
Install boom tray stowage handle (13) an d
sleeve spacer (14) between two boo m
tray angle brackets (4) and secure wit h
two new cotter pins (15), new Iockwashe r
(16), hexagon capscrew (17), and hex -
agon plain nut (18).
Apply sealing compound (item 17, app x
C) to threads of two tray handle knobs
(19) and install two tray handle knobs o n
handle (20) of snatch block stowage tra y
(21) .
If removed, install safety chain (22) t o
quick release pin (23) .
Position safety chain (22) and quick
release pin (23) on snatch block stowag e
tray (21) and secure with new solid rive t
(24) .
Install snatch block stowage tray (21)
and secure with headless straight pi n
(25), two flat washers (26), and tw o
new cotter pins (27) .
2-32 0