TM-9-2350-238-34-2

CRANE (CAB) COMPONENTS, RECOVERY VEHICLE, FULL TRACKED: LIGHT, ARMORED, M578

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

APRIL 1992

  TM-9-2350-238-34-2 - Page 150 of 327

TM 9-2350-238-34-2
2-32. MAINTENANCE OF STAGE TWO CARRIER ASSEMBLY.
This task covers: a.
Disassembly
b.
Inspection/Repair
c.
Reassembly
INITIAL SETUP
Tools and Special Tools
Electrode, welding
General mechanic’s tool kit, automotive
Gloves, welder’s
(SC5180-90-CL-N26)
Helmet, welder’s
Shop equipment, automotive mainte-
Holder, electrode
nance and repair: field maintenance,
Welding, machine, arc
basic, less power (SC 4910-95-A31)
Drill press
Drill twist, no. 3
Grinder
Press, arbor
Tap and die
Shop equipment, sets,
tools: welding shop,
(SC 3431-95-A04)
Apron, welder’s
DISASSEMBLY
References
MIL-STD-1261C(MR)
TM 9-2350-238-24P-2
Equipment Conditions
kits, outfits, and
2-111 Stage two carrier assembly
trailer mounted
removed
1 Remove three setscrews (1) from carrier
(2),
Mark each of three planet gear
headless straight pins and their loca-
tion in carrier so that planet gear
headless straight pins can be put in
same holes during reassembly.
DRIFT
2
Using hammer and drift, remove three
planet gear headless straight pins (3) from
carrier (2).
2-137


Back to Top