TM 9-2350-238-34-2
2-33. MAINTENANCE OF STAGE THREE CARRIER ASSEMBLY (CONT).
REASSEMBLY (CONT)
5 Using hammer and punch, peen lip of
each of three planet pinion gears (5) in
four equally spaced places around each
roller bearing (4).
6 Install three planet pinion gears (5) and six
pinion gear flat washers (6) each, in car-
rier (3).
7 Install three new gear pins (7) in carrier
(3).
NOTE
●
If a new carrier is used, drill and
tap
a
0.250-in.(0.635-cm),
28
UNF-2B hole 0.375 in. (0.953
cm) deep between each gear
pin and carrier.
●
If only new gear pins are used,
drill and tap a new hole be-
tween each new gear pin and
carrier. Drill new holes approx-
imately 180 degrees from old
holes.
OLD HOLES
8 Install three new setscrews (8) in carrier
(3). Tighten and stake each new
setscrew.
NEW HOLES
2-144