TM-9-2350-238-34-2

CRANE (CAB) COMPONENTS, RECOVERY VEHICLE, FULL TRACKED: LIGHT, ARMORED, M578

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

APRIL 1992

  TM-9-2350-238-34-2 - Page 90 of 327

TM 9-2350-238-34-2
2-26. MAINTENANCE OF STAGE TWO BOOM WINCH CARRIER ASSEMBLY.
This task covers: a.
Disassembly
b.
Inspection/Repair
c.
Reassembly
INITIAL SETUP
Tools and Special Tools
General mechanic’s tool kit, automotive
(SC5180-90-CL-N26)
Shop equipment, automotive
maintenance and repair: field
maintenance, basic, less power (SC
4910-95-A31)
Drill press
Drill, twist, no. 3
Grinder
Press, arbor
Tap and die set
Shop equipment sets, kits, outfits, and
tools: welding shop, trailer mounted
(SC 3431-95-A04)
Apron, welder’s
Electrode, welding
Gloves, welder’s
Helmet, welder’s
Holder, electrode
Welding machine, arc
Materials/Parts
Hydraulic parts kit (5702992)
References
MIL-STD-1261C (MR)
TM 9-2350-238-24P-2
Equipment Conditions
2-42 Stage two boom winch carrier
assembly removed
DISASSEMBLY
1 Remove three setscrews (1) from carrier
(2).
2-77


Back to Top