TM-9-2350-238-34-2

CRANE (CAB) COMPONENTS, RECOVERY VEHICLE, FULL TRACKED: LIGHT, ARMORED, M578

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

APRIL 1992

  TM-9-2350-238-34-2 - Page 94 of 327

TM 9-2350-238-34-2
2-27. MAINTENANCE OF STAGE THREE BOOM WINCH CARRIER ASSEMBLY.
This task covers: a.
Disassembly
b.
Inspection/Repair
c.
Reassembly
INITIAL SETUP
Tools and Special Tools
General mechanic’s tool kit, automotive
(SC 5180-90-CL-N26)
Shop equipment, automotive
maintenance and repair: field
maintenance, basic, less power (SC
4910-95-A31)
Drill press
Drill, twist, no. 3
Grinder
Press, arbor
Tap and die set
Materials/Parts
Grease (item 9, appx B)
Carrier assembly parts kit (5704875)
References
TM 9-2350-238-24P-2
Equipment Conditions
2-42 Stage three boom winch carrier
assembly removed
General Safety Instructions
Clutch release carrier contains
spring under high tension. Use
caution during removal and
installation.
DISASSEMBLY
1
2
3
4
5
Remove three setscrews (1) from clutch
release carrier (2).
Using drift, remove three planet gear pins
(3) from clutch release carrier (2).
Remove three spur gears (4) from clutch
release carrier (2).
Remove two flat washers (5), one bearing
sleeve spacer (6), and 68 roller bearings
(7) from each of three spur gears (4).
Remove preformed packing (8) from reac-
tion shaft of clutch release carrier (2).
2-81


Back to Top