Table 1.
Operator Preventive Maintenance Checks and Services (PMCS) – Weekly - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
18
WEEKLY
Gas Particulate
Filtration Unit
(GPFU)
1. Operate GPFU (WP 0041) and check motors for
smooth operation.
GPFU does not operate.
2. Check outlets for air flow.
No air flow from outlets.
3. Check cable assembly for worn or cracked insulation
and loose connections.
4. Check all hoses for wear, damage, or deterioration.
5. Check entire filter unit assembly for dents, cracks, or
missing parts.
6. Check hose connection to protective mask.
19
WEEKLY
Smoke Grenade
Launcher
System
WARNING
Before performing any maintenance on
smoke grenade launcher system, visually
confirm that no smoke grenades are in
launcher tubes. If grenades are found,
remove grenades from dischargers and
return them to metal ammunition storage
boxes. Failure to comply may result in
personnel death or injury.
1. Check that indicator light comes on when ARM/OFF
switch is set to ON position.
2. Check electrical connector to launcher control for
frayed wires, tears, and/or any damage rendering the
cable unserviceable.
3. Clean smoke grenade launcher tubes (WP 0122)
and ensure drain holes are free of obstruction.
TM 9-2350-256-10
0099
0099-16