TM 9-2350-256-34
0054 00
INTERMEDIATE MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
HOIST
WINCH
MOTOR REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Tool kit, general mechanic’s (item 34, WP 0086 00)
Materials/Parts
Gasket (item 7, WP 0087 00)
Lockwashers (11) (item 163, WP 0087 00)
Packings (2) (item 134, WP 0087 00)
Screws (7) (item 70, WP 0087 00)
Screws (4) (item 71, WP 0087 00)
References
WP 0053 00
Equipment Condition
Hoist winch counterbalance valve removed (WP 0055 00)
NOTE
LOAD TEST REQUIREMENT—Load testing of hoist winch is mandatory, prior to use, following re-
placement of the hoist winch motor.
Load testing will be accomplished by support maintenance activities.
Refer to the TESTING section in WP 0053 00 for the detailed step-by-step procedure.
Removal
1.
Disconnect hydraulic line (1) from adapter union (2).
2.
Remove seven screws (3), lockwashers (4), and manifold (5). Discard lockwashers.
3.
Remove and discard two packings (hidden) (6).
4.
Remove adapter union (2).
5.
Remove four screws (7), lockwashers (8), motor (9), pilot ring (hidden) (10), and gasket (11). Discard lockwashers and
gasket.