TM-9-2350-261-10

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

OPERATOR'S MANUAL

  TM-9-2350-261-10 - Page 371 of 761

TM 9-2350-261-10
TOWING DISABLED CARRIER WITH A RECOVERY VEHICLE — Continued
0064 00
4.
Remove cotter pin from tow pintle on recovery vehicle.
5.
Pull up on pintle hook latch and open pintle.
6.
Connect tow bar to tow pintle. Close tow pintle over tow bar. Check that tow pintle latches closed.
7.
Install cotter pin to secure pintle hook latch closed.
INSTALL TOW CABLES
NOTE
Left rear of recovery vehicle is connected to right front of disabled carrier. Right rear of
recovery vehicle is connected to left front of disabled carrier.
1.
Install two tow cables to tow hooks on front of disabled carrier and to tow hooks on rear of recovery vehicle in an X
pattern.
006400-3


Back to Top