TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 200 AMP GENERATOR SYSTEM
(M113A2 AND M1064 ONLY) — Continued
0270 00
2.
Install new grommet (5) and circuit 400 lead (6) in distribution box (3).
NOTE
If bilge pump circuit breakers were removed, see WP 0327 00 for installation. If bilge pump
circuit breakers were not removed, go to Step 5.
3.
Connect circuit 450C lead (7) to circuit breaker (8).
4.
Connect circuit 450A lead (9) to circuit breaker (10).
5.
Install new grommet (11) and circuit 450B lead (12) in distribution box (3). Connect circuit 450B lead to circuit
breaker (8).
6.
Install grommet (13) and circuit 450 lead (14) in distribution box (3). Connect circuit 450 lead to circuit breaker (10).
7.
Install new grommet (15) and circuit 2 lead (16) in distribution box (3).
8.
Install new grommet (17) and circuit 2A lead (18) in distribution box (3).
9.
Install circuit 450C lead (7) on bus bar (19). Secure with new lockwasher (20) and screw (21).
10. Install new grommet (22) and circuit 49 lead (23) in distribution box (3). Install circuit 49 lead on bus bar (19). Secure
with new lockwasher (24) and screw (25).
0270 00-4