TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 200 AMP GENERATOR SYSTEM
(M113A2 AND M1064 ONLY) — Continued
0270 00
NOTE
If bilge pump circuit breakers must be removed, see WP 0327 00 for removal. If bilge pump
circuit breakers are not to be removed, go to Step 8.
5.
Remove screw (1), lockwasher (2), and circuit 450C lead (3) from bus bar (4). Discard lockwasher.
6.
Disconnect circuit 450C lead (3) from circuit breaker (5).
7.
Remove circuit 450A lead (6) from circuit breaker (7).
8.
Remove circuit 450 lead (8) from circuit breaker (7). Remove circuit 450 lead and grommet (9) from distribution box
(10). Discard grommet.
9.
Disconnect circuit 450B lead (11) from circuit breaker (5). Remove circuit 450B lead and grommet (12) from
distribution box (10). Discard grommet.
10. Remove circuit 400 lead (13) and grommet (14) from distribution box (10). Discard grommet.
11. Remove grommet (15) and circuit 2 lead (16) from distribution box (10). Discard grommet.
12. Remove grommet (17) and circuit 2A lead (18) from distribution box (10). Discard grommet.
0270 00-2