TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 287 of 1008

TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 100 AMP GENERATOR
SYSTEM (M113A2, M1064, AND M1059 ONLY)
0269 00
THIS WORK PACKAGE COVERS:
Removal (page 0269 00-1).
Installation (page 0269 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
Sealing compound (WP 0782 00, Item 66)
Gasket
Grommet (8)
Lockwasher (6)
Lockwasher (5)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Battery ground lead disconnected (WP 0294 00)
Master switch panel assembly removed (WP 0222 00)
REMOVAL
1.
For M113A2 and M1059 carriers, remove screw (1), lockwasher (2), circuit 6 lead (3), and circuit 6L lead (5) from
bus bar (4). Remove circuit 6 lead, circuit 6L lead, and two grommets (6) and (7) from distribution box (8). Discard
grommets and lockwasher.
2.
For M1064 carriers, remove screw (1), lockwasher (2), and circuit 6 lead (3) from bus bar (4). Remove circuit 6 lead
and grommet (6) from distribution box (8). Discard grommet and lockwasher.
3.
Remove screw (9), lockwasher (10), circuit 10, 14, 15, and 27E lead (11), and circuit 450A lead (12) from bus bar (4).
Remove circuit 10, 14, 15, and 27E lead and grommet (13) from distribution box (8). Discard grommet and lockwasher.
4.
Remove screw (14), lockwasher (15), and circuit 49 lead (16) from bus bar (4). Remove circuit 49 lead and grommet
(17) from distribution box (8). Discard grommet and lockwasher.
026900-1


Back to Top