TM 9-2350-261-20-3
REPAIR PERSONNEL HEATER CONTROL BOX
0614 00
THIS WORK PACKAGE COVERS:
Disassembly (page 0614 00-1).
Repair or Replacement (page 0614 00-4).
Assembly (page 0614 00-5).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Multimeter (WP 0780 00, Item 43)
Materials/Parts
Lockwasher (1
0
)
Personnel Required
Unit Mechanic
References
WP 0069 00
Equipment Condition
Heater control box removed (WP 0613 00)
DISASSEMBLY
NOTE
Tag all electrical leads before removing.
1.
Remove circuit breaker (7) from control box (12).
a.
Remove two screws (1), lockwashers (2), lead 16 (3) from one terminal, and lead 17-D (4), lead 17-3 (5), and
jumper 15-17 (6) from other terminal on circuit breaker (7).
b.
Remove two nuts (8), four lockwashers (9), ground lead (10), two screws (11), and circuit breaker (7) from control
box (12). Discard lockwashers.
061400-1