TM 9-2350-261-34
SERVICE UPON RECEIPT
0013 00
THIS WORK PACKAGE COVERS:
Service Upon Receipt of Materiel (page 0013 00–1).
INITIAL SETUP:
Maintenance Level
Direct Support
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0104 00, Item 19)
Personnel Required
Track Vehicle Repairer 63H10
References
See your -10
See your -20
TM 9-6140-200-14
Equipment Condition
Engine stopped (see your -10)
SERVICE UPON RECEIPT OF MATERIEL
Checking Unpacked Equipment
This section provides information on how to check and service your carrier when it is received.
Level B
and
A
deprocessing
procedures are given in the following table.
Level B
deprocessing is performed when the carrier has been in storage for less
than 90 days.
Level A
deprocessing is performed, in addition to Level B deprocessing, when the carrier has been in storage for
more than 90 days.
001300-1
Install cables on battery. See your -20.
Battery cables
Hull
SERVICE UPON RECEIPT
(1) Remove shipping tape from filler caps.
(2) Add electrolyte and charge batteries. See TM
9-6140-200-14.
Carrier batteries
LOCATION
Hull
ITEM
ACTION
Install power plant access panels.
REMARKS
Power plant access
panels
Engine
LEVEL B
Remove caps and plugs from all openings to engine that vent
outside.
Caps and plugs
Engine
Hull
Driver’s hatch
Remove shipping tape from oil filter cap.
Oil filter cap
Engine
Remove shipping tape from oil level gauge rod opening.
Oil level gauge
Engine
Remove shipping tape from crankcase breather.
R emove welded n ut/bolt from driver ’s h atch to gain carrier en try.
Crankcase
Engine
Engine
(1) Connect fuel lines at quick disconnect.
(2) Connect fuel supply tubing.
Fuel lines
Engine air intake
Engine
(1) Remove air restrictor plug from air duct at air filter.
(2) Connect filter hose to air filter.
(3) Remove warning tag.