TM 9-2350-277-10
ASSEMBLY AND PREPARATION FOR USE MORTAR FIRE CONTROL
SYSTEM (MFCS), M95 ONLY — Continued
0086 01
CAUTION
Ensure power is turned off at power distribution assembly before connection of PLGR/DAGR
power cable, to prevent damage to equipment.
CAUTION
Ensure all connections are hand-tight to avoid damage to PLGR/DAGR.
To avoid damage to PLGR/DAGR, ensure that BA-5800 battery is removed from PLGR/DAGR
before connection at external power source.
To avoid damage to MFCS system, ensure that on/off switch on PLGR/DAGR is turned
off before installation of cables.
NOTE
Steps 9 - 10 apply to installation of PLGR/DAGR. Only PLGR is shown.
9.
Connect MFCS cable to PLGR (23)/DAGR. Reference TM 9-1220-248-10.
10. Position and secure PLGR/DAGR in it’s bracket (24).
008601-3
Change 5