TM 9-2350-277-20-3
0270 00
5.
Install three grommets (13) on circuit leads 400 (14), 450 (15), and 450B (16). Route leads into distribution box (2) and
install grommets in distribution box.
6.
Connect circuit leads 450 (15), 450A (17), 450B (16), and 450C (18) to bilge pump circuit breakers (1).
0270 00-6
Change 2
REPAIR DISTRIBUTION BOX (M113A3, M1059A3, M1064A3, AND M58 ONLY) —
Continued
7.
Install grommet (19) on circuit lead 6L (20). Route circuit lead 6L into distribution box (2) and install grommet in
distribution box.
8.
Install grommet (21) on circuit lead 6 (22) and grommet (23) on circuit lead 6A (24). Route leads into distribution box
(2) and install grommets in distribution box.
9.
Secure leads 6 (22), 6A (24), 6L (20), and bus bar (25) to distribution box (2) with screw (26) and new lockwasher (27).