REPLACE TRANSMISSION WIRING HARNESS — Continued
0360 00
INSPECT AND REPAIR
1.
Check leads for continuity. Replace bad leads.
2.
Check connectors and terminals. Repair bad connectors or terminals (WP 0382 00).
INSTALLATION
1.
Place new wiring harness (1) on transmission.
2.
Connect circuit 323 connector (2) to differential pressure switch (3).
3.
Connect wiring harness connector (4) to transmission connector (5).
4.
Connect circuit 366 lead (6) to transmission low oil pressure switch (7).
5.
Connect transmission wiring harness connector (8) to bulkhead connector (9).
6.
Install wiring harness (1) in four clamps (10), and secure to brackets with four screws (11), eight washers (12), and
four new locknuts (13).
FOLLOW-THROUGH STEPS
1.
Close power plant access door. See TM 9-2350-277-10.
END OF TASK
0360 00-2
Change 5


Back to Top