TM 9-2350-311-10
2-334
2-14
UNLOADING THE 155MM CANNON — CONTINUED
Procedure — Continued
3
Cannoneer no. 1 opens breechblock (3), removes propellant (4), and hands it to HD.
4
Cannoneer no. 1 places rags or other waste material in propellant chamber (5) and closes breechblock
(3).
3
4
5
3