TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 330 of 775

TM 9-2350-311-10
2-13 FIRING THE CANNON — CONTINUED
Procedure — Continued
NOTE
In combat emergency, the commander will determine if hot cannon tube procedures will be
followed.
5
Any cannon tube that has or has not exceeded the prescribed rate of fire, but does cause water from a
wet swab to boil, fry, or steam off when placed just forward of gas check seat is a hot cannon tube.
Follow procedures below.
2-232


Back to Top