TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 364 of 775

TM 9-2350-311-10
2–17 OPERATING AUXILIARY EQUIPMENT — CONTINUED
2-17.6 NBC Equipment (M109A4/M109A5 Howitzers) — Continued
b. Operation of Hull NBC Equipment — Continued
NOTE
Illustration for steps 4 and 5 shows driver’s station only, but procedures apply to both cannoneer
no. 2’s and the driver’s station.
4 Pull orifice connector (6) from bracket (7) and connect to M25A1 mask (not shown).
NOTE
Indicator light on M3 electrical air heater will go off and on during operation as heating element
adjusts to control air temperature.
5 Turn THERMOSTAT control knob (8) on M3 electrical air heater (9) to ON and incandescent lamp (10)
will illuminate. Adjust air temperature for comfort.
2-264


Back to Top