TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 366 of 775

TM 9-2350-311-10
2-17 OPERATING AUXILIARY EQUIPMENT — CONTINUED
2-17.6 NBC Equipment (M109A4/M109A5 Howitzers) — Continued
c. Operation of Cab NBC Equipment — Continued
NOTE
Illustration for steps 3 and 4 shows section chief station, but procedures apply to cannoneer
no.1‘s, gunner’s, assistant gunner’s, and section chief’s stations.
3 Pull orifice connector (15) from bracket (16) and connect to M25A1 mask (not shown).
NOTE
Indicator light on M3 electrical air heater will go off and on during operation as heating element
adjusts to control air temperature.
4 Turn THERMOSTAT control knob (17) on M3 electrical air heater (9) to ON and incandescent lamp (18)
will illuminate. Adjust air temperature for comfort.
2-266


Back to Top