TM 9-2350-311-10
3-7 FIRE CONTROL ALINEMENT TESTS AND MEASUREMENTS — CONTINUED
3-7.3
Leveling Gun Trunnions — Continued
a. Plumbline Method-Continued
14 Set off 100 mils on M15 elevation quadrant (12) and elevate the cannon tube (6) manually until the
elevation bubble (15) centers.
3-90