TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 135 of 1275

TM 9-2350-311-20-1
CONTINUED FROM STEP
I
1.
2.
3.
4.
5.
Reconnect lead 14 to output side of neutral
safety switch.
Disconnect lead 14 from input side of
neutral safety switch.
Place red lead of multimeter in lead 14 and
black lead to ground.
Turn MASTER switch ON, push STARTER
switch, and check for voltage.
Turn MASTER switch OFF.
Is voltage present?
Replace neutral safety switch (para
8-15).
1. Reconnect lead 14 to input side of neutral
2.
3.
4.
5.
safety switch.
Disconnect lead 14 from output side of
STARTER switch.
Place red lead of multimeter in STARTER
switch and black lead to ground.
Turn MASTER switch ON, push STARTER
switch and check for voltage.
Turn MASTER switch OFF.
1
Is voltage present?
Repair or replace lead 14 of bulkhead-
to-portable instrument panel wiring
I
harness (para 8-49).
I
1
CONTINUED ON NEXT PAGE
3-35


Back to Top