TM 9-2350-311-20-1
CONTINUED FROM STEP H
2.
3.
4.
5.
Reconnect powerplant wiring harness to
flame heater disconnect.
Disconnect FLAME HEATER switch lead
(lead 486) from bulkhead-to-portable
instrument panel wiring harness.
Place red lead of multimeters on lead 486 and
black lead to ground.
Turn MASTER and FLAME HEATER
switches ON and check for voltage.
Turn MASTER and FLAME HEATER
switches OFF.
I
Is voltage present?
Reconnect powerplant wiring
harness and go to step Q.
CONTINUED ON NEXT PAGE
3-111