TM9-2350-311-20-1
7-7 RADIATOR AND SHROUD (M109A3) — CONTINUED
b. Installation — Continued
11
12
13
14
15
16
Install bracket (30), eight flat washers (29), eight new Iockwashers (28), and eight screws (27).
Install surge tank-to-pressure relief valve hose (26) and tighten clamp (25).
Install aeration detector bracket (23) with detector (24), two washers (22), two new Iockwashers (21), and two
screws (20).
Install aeration detector-to-engine coolant main tube assembly hose (19) and tighten clamp (18).
Install two electrical connectors (16) and ground (17).
Install alternator (para 8-2).
7-28