TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 809 of 1275

TM9-2350-311 -20-1
8-83 NATO SLAVE START-TO-EXTERNAL POWER WIRING HARNESS (M109A4/M109A5) —
CONTINUED
a. Removal
1
2
3
4
5
6
7
Cut electrical tape to expose slave start connections.
Remove two screws (5) and two Iockwashers (6) to disconnect power (1) and ground lead (2) from slave start
receptacle (7). Discard Iockwashers.
Disconnect slave start connector (4) at driver’s bulkhead (8).
Remove four screws (9), four Iockwashers (10), and external power receptacle guard (11). Discard
Iockwashers.
Cut electrical tape to expose external power receptacle connections.
Remove screw (12) and Iockwasher (13) to disconnect cable (3) from external power receptacle (14), and
remove boot (15) from external power receptacle. Discard Iockwasher.
Remove 14 screws (16), 14 Iockwashers (17), 14 washers (18), and 14 straps (19) and lift out wiring harness
(20). Discard Iockwashers.
b. Disassembly/Repair
Disassemble wiring harness (para 2-13).
8-184


Back to Top