TM 9-2350-311 -20-1
b.
c.
d.
Disassembly
Disassemble (para
2-13).
Assembly
Assemble (para 2-13).
Installation
1 Install heat selector switch-to-circuit breaker lead (3) to circuit breaker (4).
2 Install terminal (5) on switch (2) with screw (1).
NOTE
FOLLOW-ON MAINTENANCE:
Install accessory control box (para 8-20)
8-66 ACCESSORY CONTROL BOX VENTILATOR BLOWER SWITCH-TO-CIRCUIT BREAKER
LEAD
This task covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
Tools
General mechanic’s tool kit (item 64, Appx H)
Accessory control box removed (para 8-20)
Accessory control box cover removed (para 8-20)
Connector
Wire
No.
Electrical Lead To:
No.
1
Circuit breaker
159
2
Ventilator blower switch
159
8-169
INITIAL SETUP
Equipment Conditions