TM 9–2350–311–20–2
15–6
Section II.
STOWAGE BOXES
15–2 EXTERIOR STOWAGE BOXES
This task covers:
a.
Removal
b.
Disassembly
c.
Assembly
d.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Rivet set, hand (item 10, Appx H)
Materials/Parts
Adhesive, type I (item 2, Appx D)
Lockwashers (32) (item 60, Appx G)
Lockwashers (8) (item 64, Appx G)
Plate spacers (8) (item 117, Appx G)
Rivets (24) (item 108, Appx G)
Seals (4) (item 116, Appx G)
a.
Removal
1
Remove eight machine bolts (1), eight lockwashers (2), and two retaining straps (3) from right top rear stow-
age box (4). Discard lockwashers.
2
Lift and remove right top rear stowage box (4).
3
Repeat procedure in steps 1 and 2 for remaining three rear stowage boxes.
1
2
3
4