TM 9–2350–311–20–2
15–28
Change 2
Section V.
HANDLES
15–14 HANDLES
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180-95-CL-A12)
Materials/Parts
Lockwashers (2) (item 81, Appx G)
NOTE
There are three handles located on the cab roof and two handles located on the cab wall. These
procedures are written for one handle but apply to all.
a.
Removal
Remove two cap screws (1), two lockwashers (2), and handle (3) from cab. Discard lockwashers.
b.
Installation
Position handle (3) on cab and secure with two new lockwashers (2) and two cap screws (1).
1
2
3