17–4 NBC CONTROL BOX ASSEMBLY — CONTINUED
e.
Installation
1
Install distribution box (3) using four cap screws (6), four new lockwashers (7), and four new lockwashers
(8).
2
Connect NBC power lead assembly (4) to J2 connector (5) of distribution box (3).
3
Connect cab power lead assembly (1) to J1 connector (2) of distribution box (3).
f.
Testing
Test operation of control box assembly by checking that NBC indicator lights and M3 air heaters work.