TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 154 of 343

TM 9-2350-358-BD
6-11.
HOSE LEAKAGE - CONTINUED
Option 3:
Joint, Leak.
Limitations:
None
Personnel/Time Required:
1 soldier
1.0 hour
Materials/Tools:
Patch, tire repair kit (found in M2/3 generic BDR kit, Section III, Appendix C)
Tape, duct (item 62, Appendix C)
References:
TM 9-2350-314-10
TM 9-2350-314-20-1-1
Procedural Steps:
1.
Gain access to leak.
2.
Clean area around leak.
3.
Wrap the area with tape.
4.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
Option 4
Limitations:
Reduced mobility
Personnel/Time Required:
1 soldier
0.5 hour
Materials/Tools:
Tape, duct (item 62, Appendix C)
Thin sheet metal (scavenge from available source)
Sealer, permatex (item 54, Appendix C)
Clamp, hose (item 7, Appendix C)
6-16


Back to Top