TM 9-2350-358-BD
11-15. BYPASSING FAILED COMPONENTS - CONTINUED
1.
Disconnect the tee in the hydraulic supply line from the reservoir to the manual elevation and equilibration hand
pumps from the bulkhead fitting at the reservoir.
2.
Using a 1/4-inch cap, cap the bulkhead in step 1.
3.
Install a 1/4-inch straight adapter into the tee disconnected in step 1.
4.
Connect a 7/16-inch hose onto the straight adapter in step 3.
5.
Submerge the hose from step 4 into a utility pail.
Fill with clean hydraulic fluid.
6.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
11-34