TM 9-2350-358-BD
11-15. BYPASSING FAILED COMPONENTS - CONTINUED
7
Using a 1/4-inch elbow connected to the tee in step 6, connect the hydraulic line from the clutch valve fuze.
8
Fill and bleed the hydraulic system.
9
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system
using standard maintenance procedures.
Option 3:
Equilibration hand pump inoperative (hydraulic reservoir damaged, no hydraulic fluid).
Limitations:
•
No hydraulic system pressure.
•
All functions must be done manually.
Personnel/Time Required:
•
1 soldier
•
0.5-1.0 hour
Materials/Tools:
•
Cap tube 1/4-inch (item 5, Appendix C)
•
Nipple tube, straight 1/4-inch (item 40, Appendix C)
•
Hose 7/16-inch ID 4 feet long (scavenge from available source)
•
Pail utility
•
Hydraulic fluid (item 36, Appendix C)
References:
•
TM 9-2350-314-20-2-2
•
TM 9-2350-314-34-2
Procedural Steps:
11-31