TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 250 of 343

TM 9-2350-358-BD
11-15. BYPASSING FAILED COMPONENTS - CONTINUED
1.
Disconnect the hydraulic supply line from reservoir to the equilibration hand pump at the bulkhead tee.
2.
Using a 1/4-inch cap, cap the tee in step 1.
3.
Install a 1/4-inch straight adapter into the line disconnected in step 1.
4.
Connect a 7/16-inch hose onto the straight adapter in step 3.
5.
Submerge the hose from step 4 into a utility pail.
Fill with clean hydraulic fluid.
6.
Record the BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system,
using standard maintenance procedures.
Option 4:
Manual elevation pump inoperative (hydraulic reservoir damaged no hydraulic fluid).
Limitations:
No hydraulic system pressure.
All functions must be done manually.
Personnel/Time Required:
1 soldier
0.5-1.0 hour
Materials/Tools:
Cap tube 1/4-inch (item 5, Appendix C)
Nipple tube, straight 1/4-inch (item 40, Appendix C)
Hose 7/16-inch ID 4 feet long (scavenge from available source)
Pail utility
Hydraulic fluid (item 36, Appendix C)
References:
TM 9-2350-314-20-2-2
Procedural Steps:
11-32


Back to Top