TM 9-2815-210-34-2-1
CHAPTER 2
PRELIMINARY PROCEDURES FOR ENGINE MAINTENANCE
Section I. SCOPE
2-1.
EQUIPMENT ITEMS COVERED.
This chapter gives instructions to take out the
engine from the shipping and storage container and get it ready for maintenance.
2-2.
EQUIPMENT ITEMS NOT COVERED.
All equipment items are covered in this
chapter.
Section II.
PREPARATION OF ENGINE FOR REPAIR
NOTE
This procedure is the same for all en-
gine models except where noted.
TOOLS:
No special tools required
SUPPLIES:
5 1/2-gallon container
PERSONNEL: T
W O
EQUIPMENT CONDITION:
Engine in shipping and storage container.
2-1