TM-9-2815-210-34-2-2

ENGINE ASSEMBLY, DIESEL (MULTIFUEL): NATURALLY ASPIRATED OR TURBOCHARGED, FUEL-INJECTED, WATER-COOLED, 6-CYLINDER

TECHNICAL MANUAL; TROUBLESHOOTING; DIRECT SUPPORT AND GENERAL SUPPORT LEVEL; VOLUME 2 OF 2; PART 2 OF 2

APRIL 1981

  TM-9-2815-210-34-2-2 - Page 575 of 968

TM 9-2815-210-34-2-2
1.
Open adjustable valve (1) and start fuel pump.
2.
Keep valve (1) open until system is purged of air.
3.
Close valve (1).
4.
Turn rheostat (2) until voltmeter (3) reads 24 volts. Pressure gage (4)
should read 90 to 100 psi.
5.
To set pressure, if necessary, loosen check valve locknut (5). Turn relief
valve adjusting screw (6) until pressure gage (4) reads 90 to 100 psi. Hold
relief valve adjusting screw with screwdriver and tighten check valve locknut.
END OF TASK
4-556


Back to Top