t
SOLENOID SPEeD CONTROL
IDL± PoSItioN
FULL tHrOt²lE
POsI²IOn
l
³M 9-2815´220µ34
fu¶L Th·ottLE
PoSI¸IoN
m¹º
.
»A¼6½6¾¿
I
Figure
2·57.1 Throttle
lI1±kaGEadjUsLm²³´t, MoDµl
A VDS±J²90³´DR
¶1±g·n¶.
( 15)
Remove cap plugs (I, fg. 2-40) and
individuaLly CoNNeCt The ±eFt baNk ²njeCTor tUbe
ConneCTo³s (´iGµ 2¶39) To THe ·ea· ²nJeCt²oN p¸Mp
Hyd·aULiC HEad (¹gº 2»58¼º ½o assUre adeq¸ate
w³enCh ClearanCe¾ ConneCt TUbes to ·ea³ pUMp H¿ad
Àn THe ´oÁ±owinG o·de³: 5, 3, 6 2 4 aNd 1à Sta³T
´it T²Ngs on
p¸Mp head aNd ÀÄÅeÆTor nozzle and
Ho±de³ asseMb±y by haNd unTÀ± s±eeve Às seatedÇ
WheN sLeeve Às seated an ²nCrease in to³QUe w²lÈ be
Év²denTÊ When tHÀs po²nT is reaCHed, To·Ë¸e t²gHTen
to 3ÌÍ pouNdÎÏNCHesÐ ½²gHTen aLl ´Uel ²njeCTo³ tube
sUppo·T n¸Ts To
Ñ25
po¸Nd»²nCHesÐ Òndivid¸a±Ly
iNsTaL± sÀx ÓÔe± ÏNJeCTo· TUbes FÕoM Cylinder Öo× ØÙ
ÚH³oUÛÜ 6Ù to FronT hyd·aUlÀC HÝad (Figà 2Î58)º ½o
assure adeËuAte wÕEnCH C±earaNCe CoNNeCt tUbes To
FÞonT pump Head in the ´olLowiNg oÕderß 2, 4, 1, 6,
5 and 3à áeCU·e TUbes to p¸mp Head aNd ²NjeCTo·
NoZâle aãäd holder assemb±ies as oUtlÀned aboVeå
( Ñ6) Position plaTes aNd ælamps on ´UçL inè
éeCTo·
TUbes and seC¸êe To ëUɱ ²NJeCTo³
T¸be
b·aCkets (2ì ´íGå 2î37¼ wiïH 1ð sñL´òÁoCKÏnG n¸ts and
MaCHóOe boLTs (Ò)º
(1ô) õosiTÀon pLates aöd CLamps oN ë¸e÷ ÏNø
ùeCTo· t¸bes as sHowÄ iN FÏGU³e 2Î59 aúd ûNstaLL
ÀÁ
I
se±´»loCk²NG NUts and bo±ts (3Â ´iGü 2»3ô)ý þNsTa±l two
CLaMps and one plaTe on Lÿ´T ·ea· CLaMp b·aCkeT
and seCU³e w²TH two seL´ĀloCk²nG bo±ts (4 ëÏGü
2ā3ô)Ă ăLoatiNG C±amps mUst be spaCed as sHowN ²n
Fig¸³e 2¶5Ą To miniMiZe vÀb³aTÀoną
( 18) õosÏT²on plaTes and Clamps oN ÓĆć± ÀNè
ÅeCtor tubes at CyLÀNdĈr Öoĉ IĊ ThrouGh ċČ and
seCUre To C±amp suppo³T (´²gº 2»3č) wiTH twelve
MaCHiNe boLTs and selë»LoCĎinG NUTsď ÒNsTĐL± CLamps
cÂaÃgÄ Å
2ÆÇÈ