TM 9-2815-224-34&P
Engine Tune-Up Instructions
NOTE
Clearance required is 0.200-m. (5.08 mm).
Be sure starting aid screw is backed out enough to make it ineffective when making
adjustment. Starting aid screw is only used with engines prior to serial number
8VF-106635.
(1)
Check gap between low speed spring cap (1) and high speed spring plunger (2) using governor
gap gage.
(2)
Loosen nut (3) and adjust screw (4) to obtain proper clearance.
b. Follow-on Maintenance.
(1)
Install governor cover (para 15-4).
(2)
Adjust injector rack control lever (para 19-6).
END OF TASK
19-6.
INJECTOR RACK CONTROL LEVER ADJUSTMENT.
This task covers:
a. Adjustment
b. Follow-on Maintenance
INITIAL SETUP
Models
All
Test Equipment
None
Special Tools
None
Supplies
None
Personnel Required
MOS 63W, Wheel vehicle repairer (2)
References
None
Equipment Condition
TM or Para
Condition Description
Para 19-4
Fuel injection timing
adjusted.
Para 19-5
Governor gap adjusted.
Para 15-7
Buffer screw switch
removed.
Para 15-5.1
Fuel modulator clamp
removed from injector
control tube (engines
equipped with fuel
modulator only).
Special Environmental Conditions
None
General Safety Instructions
None
Level
of
Maintenance
Direct Support
I
Change 2
19-9