PS Magazine - JULY 1972

PS, The Preventative Maintenance Monthly

1972 SERIES, ISSUE 236

JULY 1972

PS Magazine - JULY 1972 - Page 23 of 35
i.
When you place ChE gear box in
posItion, eye the mountiNg area on
thE Rail Bom to makE surE that thE '
afC 2 washers and fOrward alumI±um
angle arE bonded In place. ²f any of
³hose par´s are missing you wonµt
bE able Co mou±t thE gear box on a
lEvel surface. The result will ¶
cracks in thE Rail ·oom mounting
surface.
So, fabricate a Y-in plaCE accord¸
ing to thE dirEctions "in TM 55-1520¹
228¹20 (ºct 70).
²t was wrong¹way Murphy who said,
»²f a little bit of greAsE is good, a whole
lot is better¼½
¾¿oUrsE, ³haR phony slogan never did
apply to aircraft. ²t dEfinitely doesnÀt go
for the engine¹to¹transmission drive¹shaft
couplingsÁ
Pack ChaR baby by hand every 300
hours Using Ânderol 786Ã ºne 6¹oz CUbE,
FSÄ 9150¹926¹1969, will CakE carE of
both couplings¼ SprEad a 0.20¹0¼30 inch
coating EvEnly ovEr thE top of ³he spline
teeth.
²f yoU Use too much grEaÅe ³hE drivEÆ
ÇÈÉÊË
shaft¹coupling seal will rupture. Ìou
know what ³hat meansÍa lot oÎ Extra
swEaR and El·ow grEasE Co stop the leak!
in water, so, ³hat condition mEans yoU
wan´ ³o Ïrain and flush the gEar ·ox,
rÐGh³ nowÑ Water In tHe gEar box will givE
you a ¶aring failUre.
WhEn working aroUnd thE rotor hEad
kEEp yoUr brogans off the torque ³ube or
yoUr ·Ird will end Up ĺÒS. ThosE parts
are noR stocked aC organizational main¹
À¿ourse, ExcEssive
assEm·ly with the g
_
ovErnor minimUm
and ÓaximUm ÒPÔ stop will also damÆ
.±,²³'-!_
1±²
agE the torqUE tu·eÃ
So, follow Che power govErnor (Ä2)
rigging pÕp in thE enginE pub to thE
lEttErÃ
43


Back to Top
Back to Top