DMWR-9-2815-220

AVDS-1790 ENGINE OVERHAUL STANDARD

DEPOT MAINTENANCE WORK REQUIREMENT

  DMWR-9-2815-220 - Page 121 of 1422

)
5-7.
(Cont)
.
.
,
²
²
±²³
³
±
•²
,\
.
:
·± ²²
-´µ
-
·´µ¶
DMWR 9±281²³220
.
¸
¹º .»
¼
¸
½¾
·
¸
¹
º»
- ³´·µ·
¶¸
»
¿
À
approximately 350 degrees± 35 deGrees F.
Control heat process to avoid INcipIent
Melting, excessive grain GrowtH² or other unDesIrabLe structura³ changes w´icH
MIgHt reDuce tHe MecHanical properties .
¼½
CAUTµO¶
·ven prehe¸tInG is requIreD wHen welDing large sectIons
of a casting.
A welding torch sHould onLy be useD to
preHeat smaLl sections ¹aPProxIºtely 1 sQ» in. area}
¼reheat sho½LD not eXceed 3¾0 F.
¹
g.
WelDin¿.
(1)
Cracks.
Àhe inert Gas sHielded arc weLding process sHaLl be useÁ wHen
making repaÂrs on alumIým alLoy.
After casting has reached the prescribeD pre-
Heat teÄperatureÅ
Æ
posItion the castIng Into the Most advantageous weLÇing positionÈ
Cover castInG wItH asbestos bLanketsÅ except for area to be weLdeD.
ÉelD tHe o½t-
sIDe miLLed groove with a good root welD.
Apply ÊILlet weLDs untIL groove Is
cËosedÌ
Rotate casting and weÍd insiDe groove iÎ tHe same ManÎer if doÏbÐe
V
is
usedÑ
Òemove asbestos bLankets and allow castings to cool progressiveLy to room
teMPeratÓreÔ
Õ2) Fractured anD mIssinÖ MetaL.
FoרowinÙ tHe procedure oÏtlIÎeD IN (1)
above, pLace insert piece in opening, alIgn and secure with cLaÄps or tack weld
iN tHree or four pLaces wItH one inch welDsÌ
¼Lace a good root weld In groove
aND apply ÊIllet welds ½ntIl Groove Is closedÌ
Rotate casting anD weLD inSIde
gÚoove iÎ the same manneÛ.
ÜOÝE
THe ÞeÄperatÏre oÊ tHe castIng sÏrrounDIng the weLdeD area sHo½lD not
exceed ß95 degrees.
àÊ necessaryá stop weLDIng² cover castIÎg with
asbestos bÐanket
â
and allow to cool to a satisfactory tãperatÏÛe then
resÓäe weLDIngå
h.
æInal insçectIon and cLean uè.
RepaIred cracks and areas where metal Has
been rep³aced mÏst Be r¸dioGr¸phically inspecteD and be eQuaL toá or better tHan²
reference standard é² TACOê ëìí 113á Apr 69 (availabLe from îïTACOð ñRòóA).
ALl
oÞHeÛ areas sHall be inspected by Dye penetrant.
íefects Must be reôwe³deõ in
aöcordance witH above M÷thodsÑ
ðeasure
casting and coMpare diMeÎsions taken
before repaiÛÑ
íImensional change wilL not exceed that as speciÊieD
on
applicable
engIneerIng DrawIng² except as noted.
Check øachIned s½Ûfaces foÛ warpage or
ùtheÛ DiMeÎsional changesÔ
Clean seaMs with a wIre br½sH and remove weLD beads
and all sharp edgesÔ
úûray entire repaiÛed area.
ReMove excess flux with sÏIt-
able Materialü rInse with c³ean waÞer² DryÅ and anodize.
¼ressure test oiý passages
/J
that Have beeþ ÛepaireD to ÿĀ psi air; use soap soLution to detect any leakā
¾Ă8Ô
AssembËyÔ
a.
ăeneÛaĄ.
Extreąe care m½st be exeÛcised
in
aLl ¸sseĆbly opeÛ¸tIons to insÏre
ćJ
5/11


Back to Top