12-100. TROOP/CARGO WINTERIZATION HEATER ASSEMBLY REPLACEMENT (Cont’d)
SMI 9-2320-387-14&P-1
Change 4
12-153
FOLLOW-ON TASKS: • Install heater guard assembly (para. 12-98).
• Connect battery ground cable (para. 4-68).
• Operate troop/cargo heater (TM 9-2320-387-10) and check for fuel leaks.